Demand Response: Making energy pay

From an environmental point of view, demand response means that the UK doesn’t have to use expensive part loaded coal fired power stations as often as it would otherwise. One organisation now benefiting from demand response is East and North Hertfordshire NHS Trust.

The facilities managers at Lister Hospital, a large acute hospital in its local area, recently set about upgrading their high voltage electricity network. To ensure that the hospital would have a completely reliable standby power solution in the event of a power failure, they wanted to install new on-site generators and a duplicate electricity feed into the hospital’s ring main. The generators would also enable the hospital to take part in demand response programmes, which it understood would help it to save on utility bills and create a new revenue stream.

Enter the aggregator
As the network upgrade project neared completion, an external consultant for the NHS Trust evaluated several ‘aggregators’ and selected KiWi Power to provide a solution at the hospital. To begin with, engineers visited the site to meet with the facilities and operations staff and to assess existing systems. Following an initial kick-off meeting, they created a full project management plan, installation risk management and method statement for the installation phase.

Four new 2MVA, LV diesel generators were installed which provide full back-up for the new 5MVA, duplicate 11kV feed from UK power networks. The Trust also implemented a system for controlling these generators remotely from Kiwi Power’s control centre in London, and integrated this with the hospital’s SCADA (supervisory control and data acquisition) and programmable logic controller systems. KiWi Power can now monitor the status of all four generators at all times and inform the hospital’s facilities managers as soon as any problems arise.

Smart meters were integrated into the hospital’s existing control systems which tell the National Grid how much electricity the hospital uses every minute - a requirement for organisations taking part in demand response programmes. Past data collected by the meters can predict when the next periods of maximum demand for electricity will fall, and automatically switches the hospital to standby generator power at these times, exporting the electrical load onto the local UK power networks’ distribution system. In using less power during peak times, the hospital can achieve even greater savings on its utility bills. The generators will also create a revenue stream for the hospital as they will supply a surplus amount of electricity that the hospital can export back to the grid.

A new revenue stream
By investing in its electrical systems upgrade, which also includes a new combined heat and power plant, Lister Hospital now has new and efficient electricity services. The site is expected to generate more than £100,000 a year in revenue from taking part in the demand response programme and avoiding peak tariffs.

The hospital takes no financial risks in achieving this - it has incurred no upfront costs in taking part in the demand response programme, and will not have to pay any out of pocket penalties if it ever fails to switch to its generators at peak times.

Now that KiWi Power manages the process of resilience testing the generators, Lister Hospital can operate within the demand response programme and ensure that all the systems it uses are fully functional and fit for the scheme.

Lister Hospital’s export capacity is now 4.5MW, which it can deliver via four Perkins, 2MVA, LV diesel generators and via surplus power from the 1.4MVA combined heat and power plant.

Dean Goodrum, East and North Hertfordshire NHS Trust’s head of estates and facilities, said, “I have worked with KiWi Power over a three month period and during that time they have progressed well with both the work required and in accordance with the milestones agreed at the start of this project. I have been very impressed with their technical ability and attention to detail. All in all this has been a prime example of partnership working.”

Further information
What is Demand Response?
tinyurl.com/bsqsvg
tinyurl.com/c5vza54

 

Event Diary

This story was first published in digitalhealth.net

Supplier Profiles

CDC success at Victoria Infirmary, Northwich creates ideal model for future patient pathway reforms

Northwich’s Victoria Infirmary (VIN) Community Diagnostic Centre (CDC) has enabled more patients

Gain valuable insight with Adveco for gas to electric decarbonisation projects

Adveco, the commercial hot water specialist, announces the launch of live metering of domestic ho